Syncoptic Log
Log for Project Syncoptic
See also Project Syncoptic Status
Log
- 16.09 : Matrix Illuminated! Beautiful! Bad spots identified and fixed.
- 16.09 : Electronics Refactored.
- 16.09 : Event announcement sent. Flyers made by Maja!
- 16.09 : Camera mounted!
- 16.09 : Video tested! Beautiful Image. (Thank you, RF Concepts )
- 16.09 : Main room enclosure hangs.
- 15.09 : Basic-X display program tested.
- 15.09 : Serial indexing of bright LEDs fixed.
- 15.09 : Sound Space Implemented
- 14.09 : Floor Textile Partial Suspension Test Underway
- 13.09 : Sky Hung under tension.
- 12.09 : Consolidating basic-x display programs.
- 12.09 : Serious floor hardware mounting by Lina and Gert.
- 12.09 : Completed wiring of matrix.
- 11.09 : Constellation wiki up.
- 11.09 : Constellation Invitation Sent.
- 11.09 : Event announcement up.
- 11.09 : Solder matrix.
- 11.09 : Attach floor mounting hardware.
- 10.09 : Test frame stability. Consultation with Gert on Construction. Contract Gert to mount support hardware on walls.
- 10.09 : Floor Bladders Arrived. Consulted with delivery person, Toure, who is studying communications. He would like to help us.
- 09.09 : Reconsidering sound system spec due to budget.
- 08.09 : LED Matrix Undergoing Physical Construction.
- 08.09 : The Bright LEDs are now here!!
- 08.09 : Open Constellation Design Initiative Begun.
- 08.09 : LED control from BasicX successful!!
- 08.09 : Tensile Floor Textile Construction Begun by Lina!!!
- 08.09 : More Floor Textile+Water Prototyping.
- 07.09 : More Spirited Discussion of the LED Mesh Structure!
- 07.09 : Work with LED controller software.
- 07.09 : Work on Fabric Floor
- 07.09 : Development of candidate LED mesh structure design - summary at Project Syncoptic Technology
- 07.09 : Consultations with Lina and Gert on LED mesh structure.
- 06.09 : Established details (date, time, audience) regarding public exhibition at and with FoAM
- 05.09 : Serial data transmission from Max to Basic-X successful!!!!!
- 05.09 : Obtained most remaining electronics
- 05.09 : LEDs Deliverable Monday
- 05.09 : Liquid Floor Ordered. Deliverable Monday.
- 05.09 : Rescale project to 6m x 6m, reducing floor cost by 40%.
- 05.09 : Began Testing Serial Communication Capability of BasicX
- 05.09 : LED Controllers arrived
- 04.09 : unlocked (used hardware reset to remove interrupt loop)
- 04.09 : Liquid Floor Component Tested.
(prior log available via long-term memory dump)